Projects
Previous | Next
Project | Project Description | Status |
---|---|---|
Supply of Manual ESD Station and Sand Probe Materials | Procurement Client: Exxon Mobil |
Completed |
Provision and Installation of EDOP QD, SDV 056, Shutdown Panel | Engineering, Procurement, Installation, Test and Commissioning Client: Exxon Mobil |
Completed |
Gaslift and Injection Panels | Modification of 10 Gaslift and Injection Panels Client: ASCOT Date: 2009 |
Completed |
UBIT "K" 6-Slot Wellhead Control Panel | Procurement, Installation and commissioning of 6-Slot wellhead control panel complete with 6 nos. prod. Well control modules, hydraulic control valves for SCSSV's & SSSV's. Client: Exxon Mobil Date: 2009 |
Completed |
UBIT "J" 6-Slot Wellhead Control Panel | Procurement, Installation and commissioning of 6-Slot wellhead control panel complete with 6 nos. prod. Well control modules, hydraulic control valves for SCSSV's & SSSV's. Client: Exxon Mobil Date: 2009 |
Completed |
Ubit "G' 6- Slot Wellhead Control Panels | Provision and Installation of Ubit "G' 6- Slot Wellhead Control Panels and Modules C/W 3 Production Well. Client: ExxonMobil Date: 2009 |
Completed |