Project | Project Description | Status |
---|---|---|
Modular Wellhead Control Panel for new Oredo and Abura Wells | Design, fabrication, Installation and Commissioning of 1No. 4-well modular and 2Nos. 2-well modular wellhead control panel with flowline Filter/Separator and inclusive of logistics rated at 10,000 PSI for New Oredo and Abura wells. Client: NPDC |
Not Completed |
Wellhead Control Panel for ASASA VA | Design, Procurement, Installation and Commissioning of a 12-Slot wellhead Control Panel (WHCP) complete with 7Nos. Production well control modules, hydraulic control valves for SCSSV's and control Valves for SSV's for ASASA VA. Client: Exxon Mobil |
Completed |
Wellhead control panels with two well control modules including flowline for new Oredo Wells | Design, fabrication, Installation and Commissioning of 5Nos. Wellhead control panels with two (2) well control modules with flowline Filter/Separator rated at 10,000 PSI for New Oredo wells. Client: NPDC |
Completed |
Abang 'A', Oyot 'A' & Itut 'A' wellhead platforms | Design, fabrication & delivery of CO2 - Bottle Rack for Vent System - Abang 'A', Oyot 'A' & Itut 'A' wellhead platforms - Satellite field development Project phase 1. Client: Exxon Mobil |
Completed |
Wellhead Control Panel for ASABO | Supply of wellhead Control Panel 9-Slot modular Pneumatic Panel with Switches & Indicators for PSH, PSL, Hydraulic Control Valves for SCSSV, Control Valves for SSV, Sand Probe. Also modules for Test Separator, ESD, Sump and Fusible Loop System for ASABO 'MB" Platform. Client: Exxon Mobil |
Completed |
Wellhead Safey Control Panels for Aroh 1 & 2 | Design, fabrication, Installation and Commissioning of 2 Nos. Wellhead Safey Control Panels with 2 well control modules and flowline Filter/Separator rated at 10,000 PSI at Aroh 1 & 2 wells. Client: NPDC-CHEVRON JV |
Completed |
Pilot Panel and Pneumatic Transmitter Manifold / Stand for OSO 'RE' Platform | Procurement, fabrication, Testing and Commissioning of High Pressure Protection Pilot Panel and Pneumatic Transmitter Manifold / Stand for OSO 'RE' Platform. Client: Exxon Mobil |
Completed |
Procurement, Installation and Commissioning of Wellhead Control Panel | Procurement, Installation and Commissioning of Wellhead Control Panel (WHCP) for ASABO "C" 9-SLOT Complete with 4 PRODUCTION MODULE, ESD-1 interface, EDS-2 Gauge Module, Test Separator, Master Section Hyd. Power Pack, Accumulator & Reservoir. Client: Exxon Mobil |
Completed |
Procurement, fabrication, Testing and Commissioning of High Pressure Protection Pilot Panel | Procurement, fabrication, Testing and Commissioning of High Pressure Protection Pilot Panel and Pneumatic Transmitter Manifold / Stand for OSO 'RB' & 'RD' Platform. Client: Exxon Mobil |
Completed |
Procurement of Oso Restoration High Pressure Pilot Protection Panel | Engineering, Procurement and Factory Acceptance Test (FAT) Client: Exxon Mobil |
Completed |